Free Estimating Software

Cost a job the way an estimator does: materials, labour, equipment and subcontractors line by line, then waste, overhead, contingency and profit on top. Free, no sign-up, and it exports to CSV or Excel.

By Tylar Edwards, founder of ContractorCounter. Updated .

Open the tool

Materials

$540.00
DescriptionQtyUnitUnit costCost
$540.00

Labour

$1,040.00
DescriptionQtyUnitUnit costCost
$1,040.00

Equipment

$0.00

Subcontractors

$0.00

Other costs

$0.00
Direct cost
$1,580.00
Waste
$54.00
Overhead
$196.08
Contingency
$81.70
Profit
$191.18
Estimate total
$2,102.96

How to build a cost estimate

  1. Name the job, then list materials with the quantities from your takeoff and what you pay per unit.
  2. Add labour as hours times your loaded hourly cost: wages plus super or payroll taxes, insurance and leave, not just the hourly wage.
  3. Add equipment hire by the day or week, and subcontractor prices as single lines.
  4. Set waste on materials, your overhead and contingency, then the profit you need.
  5. Download the estimate as CSV or Excel to keep, compare against the actual cost later, or turn into a quote.

Direct cost, overhead and profit are three different things

Direct cost is what this job consumes: the materials, the hours, the hire, the subs. Overhead is what keeps the business running whether or not this job happens: the ute, insurance, the phone, the accountant, the time you spend quoting jobs you do not win. Profit is what is left for the business after both. Estimates that fold overhead into a vague markup tend to win work and lose money.

The simplest way to set overhead is to divide last year's overhead costs by last year's direct costs. If you spent 60,000 running the business and 500,000 on jobs, your overhead is 12% of direct cost.

What contingency is for

Contingency covers the things you know will happen but cannot price yet: the rotten bearer under the floor, the extra coat, the access you did not see. It is an allowance in your own estimate, not a line you show the client. Keep it small on work you have done many times and larger on renovations and anything you could not inspect.

How the totals are worked out

Waste is a percentage of materials only. Overhead and contingency are percentages of the direct cost plus waste. Profit is a percentage of everything before it. So on 1,000 of materials and 500 of labour, with 10% waste, 10% overhead, 5% contingency and 20% profit, the estimate is 1,500 + 100 + 160 + 80 = 1,840 before profit, and 2,208 after it.

Estimate first, quote second

This estimate is for you. It shows where the money goes so you can decide the price. The quote is for the client: one price per item, your terms, your logo, no overhead or contingency lines. Keep the estimate after the job and compare it with what the job really cost; that comparison is how your next estimate gets better.

Before you settle on a contingency, it is worth seeing how often construction estimates and budgets miss, with sources.

Common questions

Is there free construction estimating software?
Yes. This estimate builder is free with no account: add cost lines by category, set waste, overhead, contingency and profit, and download CSV or Excel. Several paid estimating products also have free tiers or trials, usually with exports or saving held back.
Can I export the estimate to Excel?
Yes. Download Excel gives a formatted .xlsx with each category as a heading, every cost line and the allowances; Download CSV gives the same rows for any spreadsheet. Both carry a small "Made with ContractorCounter" line.
What percentage should I use for overhead and profit?
Work overhead out from your own books: last year's overhead divided by last year's direct job costs. Profit depends on your market and risk; many small contractors aim for 10 to 20% on top of cost and overhead, but your numbers are the only ones that matter.
Does it include a cost database?
No. Prices vary too much by region and supplier for a built-in list to be accurate, so you enter what you pay. The builder remembers your last estimate on this computer.
How is this different from a spreadsheet?
The structure and the maths are already set up: categories, waste on materials only, overhead and contingency on cost, profit on top, and a total that matches the export. You can still take it into a spreadsheet afterwards.
Can I get quantities from drawings?
Not here: you type quantities in. ContractorCounter measures them from PDF plans, so the areas, lengths and counts land in the estimate without retyping.

ContractorCounter

Estimating every week?

ContractorCounter measures the quantities off your PDF plans, keeps every estimate and turns it into a client quote, from US$1 a week.

Estimate from my plans

About the author

Tylar Edwards

Tylar Edwards

Founder of ContractorCounter · B.App.Sci. (Construction), Curtin University

Tylar spent nine years on the engineering and contracts side of $50M to $500M Australian construction projects, measuring drawings and pricing variations by hand, before moving into software. He builds these free tools and the paid app behind them, and checks each page against the products it describes.